Design & delivery process

From first conversation to confident handoff.

A structured process over a technically complex part of the home, so the builder, the architect, the homeowner and the specialty trades all know where things stand at every stage.

01 · Overview

Five stages.

01

Discovery

We review plans, the project stage, the owner's outage expectations, the major electrical loads, the solar and storage outcomes they want, and the site constraints that will shape all of it.

02

Resilience concept

The preliminary strategy: priority loads, resilience zones, the battery approach, solar integration, the generator pathway, equipment space and a budget range.

03

Design coordination

We take the concept to the project team and settle electrical-room needs, panel architecture, conduits, controls, communications, roof and PV pathways, and rough-in requirements.

04

Delivery

Procurement, installation, inspections, construction coordination and project communication through completion.

05

Commissioning & care

We test outage operation, enrol monitoring, document the system, train the homeowner or estate manager, and set up long-term support.

02 · Against the construction schedule

Each stage lands where the decision actually gets made.

Project stagesFour construction stages run left to right: schematic design, design development, rough-in, and commissioning.01Schematic designOutage goals andpriority loads02Design developmentElectrical room, panels,pathways, controls03Rough-inProcurement, install,inspections04CommissioningOutage test, monitoring,handoff

03 · From the project team

The earlier the information, the better the system.

None of this has to be complete to start. Send what exists and we will tell you what is missing.

  • Current architectural, electrical and site plans
  • Project location and construction schedule
  • Service and distribution concept, where one exists
  • Major mechanical and electrical equipment schedule
  • What the owner expects to keep running during an outage
  • Solar, EV, snow melt, spa, well, guest structure and generator expectations
  • Electrical-room and exterior equipment constraints
  • Preferred communications and the decision-makers

04 · From HRS

Clear scope. Clear coordination. Clear handoff.

  • System narrative and scope assumptions
  • Project-specific concept and coordination documents
  • Equipment-space and rough-in requirements
  • Procurement and schedule visibility
  • Construction updates and issue management
  • Commissioning checklist and a real outage test
  • Monitoring enrolment and user training
  • As-built documentation and care recommendations

Next step

Start at the stage you are in.

Reviewing schematic plans, preparing for rough-in, or weighing a major renovation — we can name the next resilience decision that needs making.